The regulation is complex. The tool shouldn't be.

AI-powered simulation for road works under national rules such as RSA 21 — for municipalities, planning offices, and construction companies.

OUR MISSION

01

Precision

Real data from TomTom, HERE, and OSM. Emission modelling via HBEFA 3.1. No assumptions, no approximations.

02

Compliance by design

RSA21 is not a checkbox. It is built into the architecture — so every output is legally sound before you export it.

03

Speed without shortcuts

RSA21 is not a checkbox. It is built into the architecture — so every output is legally sound before you export it.

WHAT WE OFFER

CORE

Traffic simulation

Model the real impact of a road closure before a single cone is placed. Powered by Eclipse SUMO — the same engine used by research institutions and transport authorities across Europe.

COMPLIANCE

RSA21-ready documentation

Export legally compliant planning documents directly from the simulation. No manual reformatting, no compliance guesswork — documents you can submit and sign with confidence.

DATA

Real traffic data integration

Simulations run on verified, live data — not assumptions. Integrated with the leading providers used by transport planners across Germany and the wider DACH region.

Coming soon

HARDWARE SENSOR NETWORK

Physical sensors deployed on-site to validate simulation accuracy and provide real-time traffic monitoring.

OUR DIFFERENTIATOR

Eclipse SUMO integration is not a feature — it is the foundation. Most SaaS tools approximate traffic behaviour. BauSignal runs the same simulation engine used by transport researchers, fully calibrated and integrated in-process.

40%

Faster recovery from congestion

12+

Interactive KPI metrics

3D

City-scale digital twins

REGULATIONS

The rules behind the plan

Temporary traffic management follows national rules. These are the main references for the three countries we cover.

Germany

Contractors obtain the traffic order (VAO) before works start by submitting a traffic sign plan. Each federal state introduces RSA 21 itself, so the rules of the state where the works take place also apply.

BauSignal’s document export follows RSA 21.

Montenegro

The new rulebook on temporary signing has applied since 26 September 2026, and the amendments to the Law entered into force on 7 August 2026.

Our Ulcinj pilot ran in Montenegro. Automated document export currently follows RSA 21, so talk to us about documents for Montenegrin projects.

Spain

Instruction 8.3-IC covers fixed works outside built-up areas on the state network and must be applied together with RD 465/2025. Works need the road owner’s authorisation and prior notice to the traffic authority. Regional or municipal rules may apply on other networks.

Automated document export currently follows RSA 21, so talk to us about documents for Spanish projects.

Regulations change. Check the current text with the authority before you submit. The authority decides each case and no tool can guarantee that a plan will be accepted. Last checked: 5 November 2026

PACKAGES

A package for the way you work

Pricing depends on your project volume and scope. Tell us what you need and we will send you an offer.

STARTER

Up to 5 projects

Traffic simulation (SUMO)

TomTom + HERE data

RSA21 document export

Up to 5 active projects

Email support

Request an offer

PRO

Unlimited projects

Everything in Starter

Unlimited projects

Real-time data feeds

Heatmap + bottleneck analytics

12+ KPI metrics

Priority support

Request an offer

ENTERPRISE

Custom volume

Everything in Pro

Multi-user access

Full API

3D digital twins

Custom integrations

Dedicated account manager

Request an offer

CASE STUDIES

7 months. 4 concrete results.

PILOT COMPLETED

Ulcinj, Montenegro · 2024

Connected crossroads — summer congestion solved

2

Consecutive seasons

0

New infrastructure

40%

Congestion reduction

Problem

Summer congestion on the Port Milena — New bridge — Velika plaza section.

Solution

Traffic flow analysis and signal optimization using Eclipse SUMO. No physical changes to infrastructure.

Result

Normal flow achieved and maintained for 2 consecutive tourist seasons.

No new infrastructure. Just simulation.

"BauSignal helped us understand traffic patterns we could only guess at before. The simulation showed us where the actual bottlenecks were — not where we assumed they'd be."

MV

Marko Vukčević

Transport Planning, City of Ulcinj

"We avoided a 2-year construction project and achieved better flow with signal timing alone. The ROI was immediate — summer 2024 ran smoothly for the first time in years."

DP

Dragan Prelević

Municipal Infrastructure Lead

Partners

City of Podgorica

UNDP Balkans

Eclipse SUMO

TomTom

HERE Technologies

CONTACT

Request a demo or get in touch.

We respond within 24 hours. For urgent requests, reach us directly via email or LinkedIn.

LocationPodgorica · Berlin
LinkedInBauSignal

We use your details only to answer this request. See our privacy policy.